Anton/Bauer 80750074 Manual Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 6
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
3
INSTALLATION INSTRUCTIONS
Step 4
Place the cable assembly from Step 2 into
the PowerTap Front, on top of the strain
relief. Ensure that the Banana pins are
seated correctly. Crimp the strain relief
onto the cable using a pair of pliers, or
similar.
Crimp the
Strain relief
Step 5
Install the P-Tap Blank into the PowerTap
Front as shown. Note the orientation of the
lip.
Step 6
Install the PowerTap Back onto the
assembly. Insert the 2-56 Nut into the
hexagon hole. Insert the 2-56 Pan Head
Screw into the opposite side and tighten.
P-Tap Blank
Nut 2-56
2-56 Pan Head Screw
APPROVED
Vista de pagina 4
1 2 3 4 5 6

Comentarios a estos manuales

Sin comentarios